Here are the general steps to lay construction mats of connection mode:

1.Ensure site flat: Before you start putting down the construction mats, make sure the ground is clean and level. Pick up any debris, rocks, or smooth out any uneven parts so you’ve got a nice, stable base.

2.Check the mats: Before you start installing, look over the construction mats. Make sure there aren’t any broken or bent parts. Also, double – check that the sticking – out parts are in good shape.

3.Start laying from the edge: First off, put the first mat at the edge of the area you want to cover. Make sure it lines up with how you planned to lay them out. If there are any marks or guides on the ground, follow them to place it right.

4.Assemble the mats: If necessary, some connectors are used, so that multiple mats can be formed as a whole, which is not easy to disperse and more stable

5.Continue laying the mats: Next, just do the same thing for each new mat. Connect them one by one, row after row. As you work, ensure the alignment and connection of the mats are even and secure throughout the entire surface.

ground protection mat

6.Handle corners and edges: the size of the delivery was calculated exactly in line with the site size, if there are many extra mats after laying, it is necessary to check whether the stitching is wrong. And ensure that the corners are well – sealed and stable.

ground protection mat

7.Check and adjust: After laying a certain area, carefully check the overall flatness and connection tightness of the mats. Make any necessary adjustments or re – connections to ensure the quality of the installation.

8.Final inspection: Once the entire area is covered with construction mats, conduct a final comprehensive inspection to ensure that all mats are laid correctly, the connections are secure, and the surface is smooth and even.